Connected foundation
Parking equipment does not operate in isolation. Structured cabling, fiber, switches, CCTV, intercom, loops, barriers and control-room racks have to meet at documented, tested interfaces.
01
Copper and fiber are terminated, tested, labelled and documented. Switches, gateways and wireless links are placed where field devices can be supported — not where leftover wall space happens to exist.
02
CCTV, help points, SIP devices, barriers, loops and lane indicators are treated as part of the parking operation. Cabling and mounting are prepared so vendors can connect rather than rebuild.
03
Racks, patching, workstations, displays and monitoring connections turn distributed field devices into something an operator can actually see and support.
03Site drawing
A parking site is four overlapping systems. Select a layer to isolate it, or select any item to see what TMC prepares at that point.
Typical off-street arrangement
DWG / TMC-001
Drag the sheet sideways to follow a route.
KSK-03
A base, a dedicated circuit, a data path, cooling and a UPS feed. Without these a kiosk is furniture, not a revenue point.
Layers involved
Indicative arrangement for illustration. Equipment positions, containment routes and protection are set out per project against the selected parking system and site survey.
Send the layout, the parking system being considered and the programme dates. You will get a direct answer about scope, sequence and what the site still needs.